Skip to Content

Grid connection / Protection studies

Well-set protections, before the grid reminds you

HV/MV selectivity studies, relay settings and trip analysis for wind, PV, storage and industrial substations.

Request a study
Outdoor high-voltage substation

Who it is for

When a study becomes necessary

  • →New connection or extension of an existing substation
  • →Grid operator requirements to meet before the tests
  • →Nuisance tripping or a fault whose cause remains unknown

What we do

Selectivity study

Short-circuit current calculation, coordination curves and calculation note.

Relay settings

Settings files ready to load into the substation's protection relays.

Pre-test review

Check of settings and diagrams before the grid operator's visit.

Fault diagnosis

Collecting and analysing data to find the cause of a phenomenon and propose solutions.

Example

Finding the cause of a recurring trip

From alarm logs and relay records, we reconstruct the sequence of events, identify the cause and deliver a report with concrete solutions, settings or modifications.

Substations

Wind, PV, storage, industry

Deliverable

Calculation note and settings

Approach

Manufacturer-independent

Frequently asked questions

Before you call

Do you work with all relay manufacturers?

Yes. We are not tied to any manufacturer and adapt the settings to the installed equipment.

Do you carry out injection tests?

Tests are carried out by the installer or a specialist company; we provide the settings and attend commissioning if needed.

What do you need to get started?

The single-line diagram, the connection data from the grid operator and the transformer and relay data sheets.

A substation to protect or a fault to understand?

Send us the single-line diagram or the records, and we will get back to you quickly.